Integrated Upstream & Midstream Construction

Oil & Gas Facility Construction and Maintenance

SPC coordinates civil, concrete, structural steel, process piping, equipment setting, and closeout scopes for oil and gas facilities across West Texas and the Permian Basin. From new production facilities to expansions and brownfield tie-ins, we keep each phase moving from site preparation through mechanical turnover.
Site Civil → Mechanical Turnover

New Builds. Expansions.
Brownfield Tie-Ins.

Image
— Operator Compliance & Vendor Onboarding

Prepared for Contractor Qualification and Site Access

Field schedules can stall when contractor documentation, insurance, or safety records are incomplete. Solid Pipeline & Construction maintains active compliance profiles, current safety documentation, and commercial insurance coverage to support operator review and contractor onboarding.
Image
Compliance & Field Readiness

Active Compliance Profiles

SPC maintains current profiles with ISNetworld and Veriforce, giving operator procurement and safety teams direct access to the documentation required for contractor review.

Documented Field Safety Programs

Our crews work under documented safety procedures and complete the required JSA, site orientation, permit, and pre-job requirements before beginning work.

Current Insurance Documentation

Commercial insurance certificates and supporting coverage documentation are maintained for operator review and project-specific verification.

Ready for Site Requirements

Before mobilization, SPC coordinates crew qualifications, required documentation, equipment, and site-specific safety expectations so the job does not begin with preventable paperwork or readiness issues.
— Integrated Facility Execution

Coordinating Facility Scopes from Site Preparation Through Mechanical Closeout

Facility schedules slip when civil, concrete, structural, and mechanical work are treated as separate jobs. SPC coordinates the sequence between these disciplines so foundations, steel, equipment, and piping are ready when the next crew reaches the site.
[ 01 ]
SCOPE

Site Civil & Structural Concrete

Facility execution begins with grades, access, drainage, and foundations that match the approved construction package.

Site Preparation & Grading

Clearing, excavation, compaction, drainage, access routes, and finished grades.

Foundations & Equipment Pads

Concrete foundations, piers, housekeeping pads, and equipment pads built to required elevations and dimensions.

Containment & Site Completion

Containment structures, gravel installation, fencing, and final site dressing.
[ 02 ]
SCOPE

Structural Steel Fabrication & Erection

Structural components are fabricated and installed to support the equipment and piping layouts that follow.

Pipe Racks & Equipment Supports

Fabrication and erection of pipe racks, platforms, supports, and structural frames.

Structural Installation

Field fit-up, erection, anchoring, and alignment to approved drawings.

Access Structures

Stairs, platforms, handrails, guards, and related facility steel.
[ 03 ]
SCOPE

Process Piping & Mechanical Installation

SPC executes the piping, equipment-setting, and modification scopes required to move a facility toward mechanical completion.

Process Piping Fabrication & Installation

Facility piping, manifolds, headers, valve assemblies, and skid connections.

Equipment Setting & Alignment

Placement and alignment of compressors, pumps, separators, vessels, and packaged equipment.

Facility Expansions & Tie-Ins

Brownfield piping modifications, equipment additions, header reconfigurations, and valve replacements.
[ 04 ]
SCOPE

Testing, QA/QC & Mechanical Turnover

The physical work must be tested, documented, and closed out before the operator can accept it.

Pressure Testing

Hydrostatic and other required pressure testing performed under approved project procedures and operator requirements.

QA/QC Records

Applicable weld maps, NDE reports, test records, torque documentation, and construction redlines.

Punch-List Closeout

Completion of supports, guards, labels, coatings, touch-ups, and assigned corrective work before demobilization.
Turnkey Civil & Companion Services

One contractor.
One point of contact.

Image
— Specialized Facility Construction

Construction, Expansion, and Maintenance Across Production and Midstream Facilities

SPC supports construction, expansion, and maintenance across production and midstream facilities throughout West Texas and the Permian Basin.

Compressor Station Construction & Maintenance

Civil, structural, piping, equipment-setting, expansion, and maintenance scopes for new and operating compressor stations.

Saltwater Disposal Facility Construction

Site civil, concrete, piping, pump installation, containment, and maintenance scopes for SWD and produced-water facilities.
— Facility Project Risk Control

Facility Delays Usually Start at the Handoffs

A missed dimension, incomplete work front, or unresolved turnover item can stop several scopes at once. SPC plans its assigned work around the five coordination points most likely to disrupt facility construction, expansion, and maintenance.
[ 01 ]

Disconnected Scopes and Broken Handoffs

THE RISK

Civil, concrete, structural, and mechanical crews may be working from the same schedule without confirming that each work front is ready for the next phase. A missed handoff leaves downstream labor and equipment waiting.

SPC APPROACH

We coordinate the sequence of SPC's assigned scopes, confirm work-front readiness, and communicate incomplete or conflicting conditions before the next phase begins.
[ 02 ]

Drawing, Equipment, and Field-Fit Conflicts

THE RISK

Foundation elevations, anchor-bolt patterns, underground stub-ups, skid dimensions, or flange locations do not match the approved construction package. If the conflict is discovered during equipment setting or piping installation, work stops while the parties determine a correction.

SPC APPROACH

We check critical dimensions and connection points against the approved drawings before affected fabrication or installation begins. Field discrepancies are documented and elevated for resolution before they become downstream rework.
[ 03 ]

Specialized Work Without the Required Personnel

THE RISK

A crew may be equipped for routine lease maintenance but not for process piping, structural fit-up, pressure testing, rigging, or controlled hot work. Discovering that gap after mobilization creates additional scheduling and contractor coordination.

SPC APPROACH

Crew composition, qualifications, equipment, and project requirements are reviewed against the assigned scope before mobilization. Specialized work is assigned to personnel qualified for that task.
[ 04 ]

Brownfield Tie-Ins and Limited Outage Windows

THE RISK

Work inside an operating facility must fit within operator-controlled shutdowns, isolation plans, permit requirements, and simultaneous operations. Missing material, incomplete prefabrication, or unresolved site conditions can consume a limited tie-in window.

SPC APPROACH

We coordinate our work with the operator's outage plan, confirm the material and equipment required for the assigned scope, and complete applicable pre-job, permit, and hot-work requirements before work begins.
[ 05 ]

Open Punch Items and Incomplete Turnover Records

THE RISK

Physical construction may be substantially complete while testing records, construction redlines, corrective work, or other required closeout items remain open. Those gaps can delay mechanical acceptance and commissioning.

SPC APPROACH

Applicable quality records and redlines are compiled as work progresses. Assigned punch-list items are tracked through completion, giving the operator a clearer path to mechanical turnover.
— Request Pricing

Request Pricing for Your Facility Project

Send SPC your scope, drawings, bid schedule, and site requirements. Our team will review the package and follow up regarding project fit, missing information, and next steps.
— Contact

TALK TO SPC.

Tell us what you’re scoping. An operations lead will respond within one business day.